In this piece from today's BC Hydro news they speak with Bill Dalling who has been working since August 2014 as the foreman for the Merritt Area Transmission Project; this is a smaller sibling that connects to the Interior Lower Mainland Transmission Project.
Read about it Here
Read about it Here